NameTypePhaseCouncil District
Willie Cole

Willie Cole

The Sole Sitter,2013

Bronze

72 x 27 x 42 inches

Willie Cole (b. 1955, New Jersey) is best known for assembling and transforming ordinary domestic and used objects such as irons, ironing boards, high-heeled shoes, hair dryers, bicycle parts, wooden matches, lawn jockeys, and other discarded appliances and hardware, into imaginative and powerful works of art and installations. His work surprises and delights the viewer, while commenting on everyday objects and our relentless consumption. As an African American artist of national and international importance, his work is at home in the City of Atlanta’s public collection.

Cole's work is often considered eclectic and postmodern. Employing the same object in multiples, his work combines references to art, to African imagery, to Surrealism, Dada, American pop culture and more. Sole Sitter, the work proposed for Atlanta, is an iconic example of Cole’s sculpture. At first glance it resembles a contemporary iteration of African masks and sculpture. Further viewing reveals the entire work is comprised of shoes. Like much of Cole’s work, Sole Sitter is a highly original and witty assemblage.

Cole has a personal connection to Atlanta: he was the recipient of the Lamar Dodd Fellowship at the University of Georgia, and in 2006 he was awarded the David Driskell Prize by the High Museum of Art. Sole Sitter, is representative of the best of his work – witty, thought provoking, delightful.

Renew Atlanta will install this work along Peachtree Street in Midtown. It will included in the pocket park to be built at Commercial Row Commons – Peachtree and Peachtree Place.

This installation is possible through partnership with Midtown Alliance.

Find out more about Willie Cole’s Driskell Prize here and about other honors here.

Public ArtDesign02
Byung Hoon Choi

Byung Hoon Choi afterimage of beginning 016-471, 2016 Basalt 89 x 35.5 x 23.75 inches

Byung Hoon Choi (b. 1952, Korea) represents a departure from the kind of sculpture cities commonly acquire and collect. Instead of being loud, aggressive, and full of commentary and reference to contemporary life, these works are quiet. They create mind space. They alter our state of being, becoming meditations. Special procurement designation is requested for Choi because his artwork uniquely beautiful; because it brings peace to the viewer. Choi is interested in traditional Korean craft and Asian values. He is known for elevating the traditional techniques, fusing them with modern aesthetics. He works in natural materials: wood, clay, granite and natural stone, always balancing Buddhist ideas of introspection with Taoist notions of balance.

The work purchased for Atlanta exemplifies that balance. Choi uses basalt, a material he chose for what it reveals and what it represents. When split open, basalt has sleek interior – the material itself is a contrast of both rough and smooth, light and dark, inner and outer. Choi explains:

"Basalt… was formed billions of years ago when magma erupted… the exterior is made of rough earth, but the interior is a black color. I thought the tension created by the contrast between outside and inside makes it a very suitable material for the expression of my art. Through this, all the true values of the universe are expressed inside..." (Byung Hoon Choi, designboom, November 11, 2016)

More information on Choi is available here.

Public ArtDesign
Katharina Grosse

Katharina Grosse

O.T. [Cut Y], 2019

Acrylic on bronze

20 ½ x 73 ¼ x 44 ½ inches

Katharina Grosse (b. 1961, Germany) is a wildly joyous painter. Her work would be unique to the City of Atlanta because of her exuberance and references to graffiti. Her style echoes our culture of street art and elevates the entire art form.

Grosse works with a paint gun and gorgeous, electrifying acrylics. She is known for embracing unexpected events and incidents as they arise in her work. Splashes, drips, blends all become a part of a larger pattern. She frequently works in situ, painting directly onto landscapes, architecture, streetscapes and interiors. Her work is extraordinary in its formal investigation of color combined with its immersive full body experience. In public works, Grosse is known for creating outdoor rooms that pull in the viewer, providing an experience that borders on hallucinogenic surreality.

The work proposed for Atlanta is typical to her sculptural works. Wild color covers a natural-esque form, leaving the viewer to question what it was she just encountered. Grosse’s work would bring international explorations and conversations to Atlanta’s art world.

Renew Atlanta will install this work in Freedom Park, a linear commuter parkway through one of Atlanta’s most dense areas. Freedom Park neighborhoods claim 10% of the City of Atlanta’s population (almost 50,000 residents) and close to 150 transit stops. Designated as the City of Atlanta’s Art Park in 2007, Freedom Park is home to several temporary and permanent artworks.

This installation is possible through partnership with the Freedom Park Conservancy, and the Candler Park Neighborhood Association.

Public ArtDesign02
Jaume Plensa

Jaume Plensa Self Portrait III, 2017 Stainless steel 122 x 129 ⅛ x 129 ⅛ inches

The City of Atlanta has acquired Self Portrait III, a piece which contains all the elements of Plensa’s large body of work. Lettering from nine languages -- Hindi, Chinese, Arabic, Hebrew, Japanese, Cyrillic, Tamil and Greek – form a globe around the seated figure of a man, also composed of letters. With humanity at the center of a global cacophony, this is art that speaks to the ability to communicate across national and cultural boundaries. Discussing a similar work, Plensa explains: “Many times we talk and talk… but we are not sure if we are talking with our own words or repeating just messages that are in the air. My intention is to offer something so beautiful that people have an immediate reaction, so that they think, ‘What’s happening?’ And then maybe they can listen a little bit to themselves.” (Carol Kino, New York Times, 5/8/11) Acquisition of Self Portrait III is an embrace of Atlanta’s multiculturalism, internationalism and globalism. See more works by Jaume Plensa here. Read more about Jaume Plensa here.

Public ArtDesign02
5th St Complete Street
Includes bicycle, pedestrian, and multi-modal improvements along 1.5 miles of 5th St, from Williams St near Tech Square to Myrtle St in the Midtown Garden District. The project will replace damaged sidewalks and curbs; upgrade crosswalks as needed to be ADA-compliant; infill and replace pedestrian-scale lighting; infill and replace street trees; resurface and restripe roadway pavement; and upgrade the existing bicycle facilities with high-quality connections to the larger Midtown bicycle network. Additional elements may include bulb-outs and stormwater infrastructure as funding and space permits.
Complete StreetDesign02, 03
Euclid Ave Complete Street (Design-only)
DESIGN ONLY. The Project will develop options to improve safety and walkability along the Euclid Ave Corridor and connecting streets within the Little Five Points area, including the Inman Park/Reynoldstown MARTA Station. Concept will include complete street elements, such as resurfacing, sidewalk repair, street trees, granite curbing, ADA-compliant crosswalks and ramps, lighting, and shared lane markings. The project limits include Moreland Ave from Dekalb Ave to Mansfield Ave, and Euclid Ave from Austin Ave to Candler St. The limits also include parts of Seminole Ave, Austin Ave, Sinclair Ave, Colquitt Ave, Washita Ave, Euclid Terrace, and Josephine St.
Complete StreetPlanning & Development02
Piedmont Ave Complete Street
Includes road resurfacing, sidewalk and curb improvements, a protected bike lane, and landscaping from Ponce De Leon Ave to 15th St.
Complete StreetDesign02, 06
University Ave Complete Street (Concept-only)
CONCEPT ONLY. A scoping study for University Ave and Avon Ave as a continuous corridor from Murphy Ave to Hank Aaron Dr. This project is in collaboration with Atlanta Beltline.
Complete StreetPlanning & Development01, 12
W. Peachtree St. & Spring St. QB Complete Streets
As a part of the Mayor's Action Plan for Safer Streets Across America, includes elements to improve safety for drivers, pedestrians, cyclists, and scooter riders on West Peachtree St. from Ponce de Leon to 14th St. and Spring St. from 3rd St. to 14th St.
Complete StreetPlanning & Development02, 03, 06
10th Street Bridge Connectivity Improvements
Includes lighting, fencing, landscaping, lane markings, bike connections, safe intersection treatments, and other enhancements to create a safe, beautiful, multimodal gateway to Midtown. Project limits include 10th St Bridge from Techwood Dr to Williams Street, 10th St exit ramp, Techwood Dr from 10th St to the driveway at Turner Athletic Club Techwood, and Williams St from 12th St to Peachtree Pl.
BridgesDesign02, 03
MLK Jr. Dr Bridge (Design-only)
Design Only. MLK Jr. Drive Bridge project scope includes bridge replacement between Spring Street SW and Centennial Olympic Park Drive over Norfolk Southern Railroad and Parking Lots.
BridgesPlanning & Development04
Eastside Trolley Greenway Trail
Includes the expansion of the Eastside Trolley Trail through the Reynoldstown, Edgewood, and Kirkwood neighborhoods from Stovall St to Arizona Ave.
Multi-use TrailsDesign05
PATH 400
Includes the expansion of the PATH 400 multi-use trail along SR 400.
Multi-use TrailsPlanning & Development06, 07
Westside Quarry Park
Includes the addition of roadways, parking, and trails at the new Westside Quarry Park.
Multi-use TrailsConstruction09
Westview Cemetery - West Lake Station Trail
Scoping study for multi-use trail connecting Westview Cemetery along R.D. Abernathy Blvd with Westwood Ave/Lionel Hampton Trail.
Multi-use TrailsPlanning & Development04, 10
Macon Dr @ Old Hapeville Rd & Bromack Dr
Includes the conversion of a traffic signal to an all-way stop.
Traffic SignalsConstruction12
Piedmont-Habersham-Roswell Triangle (Concept-only)
CONCEPT ONLY. A scoping study to improve vehicular and pedestrian circulation at the triangle intersection of Piedmont Rd, Roswell Rd, and Habersham Rd.
Roadway ImprovementsPlanning & Development07, 08
Inman Park Neighborhood Improvements
Includes improvements at the Edgewood Ave/Euclid Ave intersection and pedestrian improvements at the Irwin St/Lake Ave at Krog St intersection.
Roadway ImprovementsDesign02
Baker St two-way Conversion
Conversion of Baker St from one-way to two-way from Centennial Olympic Park Dr to Piedmont Ave.
Roadway ImprovementsPlanning & Development02, 04, 05
West Wieuca Rd, Path/Sidewalk Widening
Includes a sidewalk widening along Chastain Park for improved pedestrian circulation on West Wieuca Rd from Lake Forrest Dr to Powers Ferry Rd. The project also includes, curb installations, tree plantings, landscape treatments, granite installations, decorative benches, raised crosswalks, ADA upgrades, and decorative fencing.
Roadway ImprovementsDesign08
Cheshire Bridge Rd
Includes installation of pedestrian improvements to cross Cheshire Bridge Rd near the intersection of Lenox Rd.
Sidewalks & MobilityPlanning & Development06
Midtown CID ADA Sidewalk Repairs
Includes sidewalk improvements and ADA ramps on various streets in Midtown.
Sidewalks & MobilityNot Started02, 06
Peachtree Reactivation (Concept-only)
CONCEPT ONLY. Funding for planning study of Peachtree St.
Sidewalks & MobilityPlanning & Development02, 03, 04, 06
Relay Bike Share
Includes a contribution to the City of Atlanta's bike share program.
Sidewalks & MobilityNot Started01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12
Roadway Resurfacing - General
Includes resurfacing of Powers Ferry Rd and Bluefield Dr.
ResurfacingPlanning & Development04, 08
South Boulevard Complete Streets
CONCEPT STUDY ONLY. Concept study to evaluate improvement alternatives to provide protected bike and pedestrian facilities along South Boulevard from Woodward Ave to McDonough Blvd.
Complete StreetPlanning & Development01
Boulevard Pedestrian Improvements
Includes installing curb bulb outs and optimizing right-of-way along Boulevard between Highland Ave and Boulevard Pl. Project also includes construction of mid-block crosswalks, flashing beacons, pedestrian refuge islands, a short sidewalk widening, ADA ramps, and other pedestrian mobility and safety improvements at signalized intersections.
Sidewalks & MobilityPlanning & Development02
Downtown CID & Neighborhood Improvements
This project's scope will be developed using the process of Participatory Budgeting, where civic engagement will help determine budget and scope. It is expected that scope will be finalized in May 2020.
Sidewalks & MobilityPlanning & Development02
South Fork Conservancy Confluence Trail Pedestrian Bridge
ADA Accessible Ramp System Superstructure to connect the proposed pedestrian bridge over North Fork Peachtree Creek to the Confluence Trail.
Multi-use TrailsPlanning & Development06
Resurfacing - GDOT Group B
Includes resurfacing on 8th St, Baker/Highland Connector, a portion of Lenox Road, East Paces Ferry, Forrest Park Rd, Johnson Rd, Lakewood Fwy, Lenox Rd, Montgomery Ferry Dr, Oakdale Rd, Peachtree Rd, Piedmont Rd, Spring St, West Wieuca Rd, and Williams St. The project also includes new striping for bicycle facilities and ADA crossings on Lenox Rd and Johnson Rd.
ResurfacingConstruction01, 02, 03, 05, 06, 07, 08, 12
Monroe Dr / Boulevard Complete Street
Includes resurfacing and pedestrian improvements between 10th St and Woodward Ave. Signal improvements at intersections include replacement of traffic signal LEDs, cabinets, controller monitors, signal wiring, communications, and signal timing.
Complete StreetPlanning & Development01, 02, 05, 06
Monroe Dr Complete Street
Includes resurfacing and pedestrian improvements between Piedmont Circle and 10th St. Signal improvements at intersections to include replacement of traffic signal LEDs, cabinets, controller monitors, signal wiring, communications, and signal timing.
Complete StreetPlanning & Development06
Piedmont Ave TCC Extension
PHASE 1 includes fiber optic cable installation and minor signal upgrades on Piedmont Ave between 14th and 15th St. PHASE 2 includes full signal upgrades (signal poles, controller cabinet, 4G communications detectors, pedestrian signals and push-buttons, ADA ramps, and signal timing improvements) at the intersection with The Prado (Botanical Garden entrance).
Traffic SignalsDesign06
Wieuca Rd Roundabout
Installation of a two-lane roundabout for roadway and mobility improvements -- including pedestrian and bicycle safety -- on Wieuca Rd at the intersection with Phipps Blvd and Park Ave. Improvements will include roadway reconfiguration, pedestrian improvements, and bicycle facilities. The proposed project also includes a new traffic signal system at the intersection of Old Ivy Rd and Wieuca Rd. Additional work incudes utility relocation, drainage design, resurfacing, landscaping and signage.
Roadway ImprovementsDesign07
Fairburn Rd Complete Street
Includes resurfacing, multi-use trail, bike lanes, curbs and sidewalks, and intersection and drainage improvements from Martin Luther King (MLK) Jr Dr to City limits.
Complete StreetDesign10
ADA Improvements - Unallocated
Includes ADA improvements at Oldknow Drive, Old Ivy Rd, Lenox Rd, Johnson Rd, Edgewood Dr, and Dudley Ln.
Sidewalks & MobilityPlanning & Development01, 02, 05, 06, 07, 08, 09
Peachtree St. (TCC)
Includes signal upgrades, fiber communications, and signal timing optimization from Memorial Dr to Spring St.
Traffic SignalsDesign02, 03, 04, 06
Piedmont Rd Capacity Improvement
Includes the widening of Piedmont Road/SR 237 between Peachtree Rd and Lenox Rd from 5 lanes (two travel lanes in each direction and a center two-way left-turn lane) to 7 lanes (three travel lanes in each direction and a center two-way, left-turn lane). Also includes landscaping, signage, signalization, and a 12-foot multi-use path on the west side of Piedmont Rd.
Roadway ImprovementsDesign07
Marietta TCC Combo
Includes the replacement of traffic signal LEDs, cabinets, controller monitors, signal wiring, communications, ADA ramps and timing at multiple intersections on three (3) corridors: Marietta Blvd, Chattahoochee Ave, and West Marietta St.
Traffic SignalsConstruction03, 04, 09
Krog Street Tunnel Lighting
Includes installation of LED lighting in the Krog Street Tunnel.
Roadway ImprovementsDesign02, 05
Howell Mill Complete Street
Includes resurfacing, restriping, new fiber communication between intersections, signals upgrades, partial corridor raised bike lanes, sidewalk repairs, additional mid-block crossings, 3 new signalized intersections, partial road diet, and ADA upgrades from Marietta St to Collier Rd.
Complete StreetDesign03, 08, 09
North Highland Ave. Pedestrian Safety
Pedestrian improvements on North Highland Ave from Alaska Ave to Elizabeth St, including installation of mid-block crossings, a new dedicated westbound bike lane and a protected pedestrian crossing with Rectangular Rapid Flashing Beacon (RRFB) at the Inman Village Pkwy intersection. Roadway pavement markings with on-street parking and designated passenger pickup/drop-off areas also are proposed along the project limits.
Traffic SignalsDesign02
Unpaved Roadways - Phase II
Includes paving of unpaved portions of Baylor St, Carr St, Foster Place, Zadie Street, and Niles Ave.
Roadway ImprovementsDesign03
Moores Mill Rd @ W. Wesley Rd Intersection Improvements
Includes improvements to relieve congestion at the Moores Mill Rd/W. Wesley Rd intersection.
Traffic SignalsDesign08
Traffic Combo 1
Includes signal upgrades, pedestrian signal upgrades, ADA ramps, striping, intersection upgrades, detection, and signal timing coordination at the following: Claire Dr at 3 locations; Lakewood Ave at 3 locations; Sylvan Rd at 2 locations; and Cleveland Ave at 9 locations. Project also includes DESIGN ONLY of signal improvements on Sylvan Rd at 2 locations and Greenbriar Pkwy at 5 locations.
Traffic SignalsDesign01, 11, 12
Citywide ITS/Signal
Includes the replacement of traffic signal cabinets, minor signal upgrades, controllers, signal wiring, ADA ramps, fiber installation, and signal timing at multiple intersections. Locations include: 14th St, Courtland Ave, Juniper St, Linden Ave, Monroe Dr at Park Dr, Monroe Dr, Pine St, Ponce De Leon Ave, Spring St, Ted Turner Dr signal, W Peachtree St, Juniper St, Roxboro Rd, Monroe Dr, 10th St, Northside Dr at Marietta St, and Piedmont Ave. Mount Paran Rd at Northside Pkwy scope also includes intersection improvements.
Traffic SignalsDesign01, 02, 03, 04, 05, 06, 07, 08
Cascade Rd. Complete Street
PHASE 1: Includes corridor improvements along Cascade Rd/Ave from City Limits to Willis Mill Rd and from Delowe Dr to Avon Ave. Work to include resurfacing, restriping, traffic communications corridor signal upgrades, bus stop enhancements, streetscapes, extended bike lanes and pedestrian safety improvements. The project also includes a 10-foot shared-use path for bicycles and pedestrians from City Limits to Willis Mill Rd. The length of the project is approximately 2.0 miles. PHASE 2: (DESIGN ONLY) Includes corridor improvements on Cascade Rd/Ave from Avon Ave to Ralph David Abernathy Blvd. Work to include resurfacing, restriping, traffic communications corridor signal upgrades, bus stop enhancements, streetscapes, bicycle lanes, and pedestrian safety improvements. The length of the project is approximately 1.5 miles.
Complete StreetDesign04, 10, 11
J E Lowery Boulevard Complete Street
Includes the rehabilitation of pavement, improvements to pedestrian infrastructure, installation of mid-block crossings, signal coordination, and signal upgrades from Mitchell St to Joseph E Boone Blvd. Work also includes improvements to re-align the intersection of Mayson Turner Rd, in addition to landscaping, streetlight and hardscaping to improve aesthetics.
Complete StreetDesign03, 04
ADA Improvements - Local Neighborhoods
Includes resurfacing, curbing, and ADA ramps on 3rd Ave from Alston Dr to Memorial Dr. Also includes ADA ramp installation and sidewalk repair in the Midtown, Candler Park and Poncey Highland neighborhoods, and along North Avenue & Hurt St. at Freedom Park.
Sidewalks & MobilityConstruction02, 05
15th St Extension
Includes the extension of 15th St two blocks westward from West Peachtree St to Williams St to improve traffic circulation for vehicles, bicycles, and pedestrians through the Midtown area.
Roadway ImprovementsDesign06
DeKalb Ave Safety Improvements
Includes upgrading traffic signal coordination and intersection improvements, resurfacing of Dekalb Ave from Jackson Street to Ridgecrest Road, and removal of the reversible lane from Jackson Street to Oxford Place. Protected bike lanes have been proposed as part of the Mayor's Action Plan for Safer Streets Across Atlanta.
Roadway ImprovementsConstruction01, 02, 05
Little 5 Points CID Improvements
Includes the construction of a new pedestrian place comprised of sidewalk and ADA ramps, pedestrian furniture, bicycle racks, redesigned tree wells, and additional landscaping of 0.1 acres at the intersection of Moreland, Euclid, and McLendon avenues. Other improvements include stormwater infrastructure replacement, utility relocation, and pedestrian lighting.
Sidewalks & MobilityPlanning & Development02
Campbellton Rd Complete Street
DESIGN ONLY. Includes complete street and smart corridor design elements, which will improve the overall mobility, safety, and accessibility of the roadway for all users. The project extends from US 29/Lee St to Enon Rd (Atlanta city limits).
Complete StreetDesign04, 11, 12
Central Ave Bridge
Includes bridge replacement from Martin Luther King (MLK) Jr Dr to Decatur St. Work includes new lighting, repair of approaches, and modification of curbing to create a full lane between Wall St and Decatur St. Parking to be determined through coordination with the Department of Public Works - Office of Transportation.
BridgesDesign01, 04
Traffic Combo 4
Includes signal upgrades, pedestrian signal upgrades, ADA ramps, striping, intersection upgrades, and vehicle detection at 15 isolated locations throughout the city.
Traffic SignalsDesign01, 02, 03, 04, 05, 06, 08, 09, 10, 12
RD Abernathy Blvd Complete Street
Includes the development of a high-level corridor vision for RD Abernathy Blvd, between Cascade Ave and Martin Luther King (MLK) Jr Dr, as well as, a high-quality connection across Martin Luther King (MLK) Jr Dr to the MARTA West Lake Station via Anderson Ave. Design and construction of this project is being coordinated with a GDOT resurfacing/restriping maintenance project. This project is in collaboration with Atlanta Beltline.
Complete StreetDesign04, 10
Dekalb Ave Complete Street (Design-only)
DESIGN ONLY. Includes corridor improvements and complete street elements, such as sidewalk repair and ADA-compliant crosswalks, and ramps from Peachtree St to City Limits. Some sections include bicycle facilities.
Complete StreetPlanning & Development01, 02, 05
Piedmont Ave Pedestrian Safety
Includes a pedestrian crosswalk with a concrete median, Pedestrian Hybrid Beacon (PHB) signal, and drainage upgrades at the Linden Ave intersection.
Traffic SignalsDesign02
West Lake Ave Bridge Replacement (Design-only)
Bridge replacement over CSX and MARTA tracks near I-20 and Martin Luther King (MLK) Jr Dr. Design includes sidewalk and multi-use trail.
BridgesDesign03, 04
10th St (TCC) ( West ) (Design Only)
DESIGN ONLY. Includes signal upgrades, fiber communications, ADA ramps, and signal timing optimization from Howell Mill Rd to Fowler St.
Traffic SignalsDesign03
Project Scoping and Engineering Studies
Review of select locations throughout the city for intersection improvements using roundabouts and peer review of select existing roundabouts.
Roadway ImprovementsPlanning & Development01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12
Unpaved Roadways - Phase I
Includes paving of unpaved portions of Ayr St, Braeburn Rd, Ford St, Hirsch St, James Dr, Main St, Marktwo Place, and Newman Place.
Roadway ImprovementsDesign01, 03, 05, 06, 09
14th St (TCC) / State St ( TCC)
Includes signal upgrades, fiber communications, ADA ramps, and signal timing optimization on 14th St from Howell Mill Rd to Northside Dr, and on State St from 10th St to 16th St.
Traffic SignalsDesign03
Piedmont Ave Signals
Includes cabinet upgrades and fiber communications to all traffic signals, and a mast arm pole replacement at the Piedmont Ave/Decatur St intersection.
Traffic SignalsConstruction01, 02, 04, 05
North Ave Complete Streets (Design-only)
DESIGN ONLY. Includes resurfacing, sidewalk repair, landscaping, curbing, ADA-compliant crosswalks and ramps, lighting, and traffic calming devices (where applicable), from Beltline East to Moreland Ave. Pedestrian improvements also will be constructed at North Ave and Somerset Terrace.
Complete StreetDesign02
J E Boone Boulevard Complete Street
Includes resurfacing, sidewalks, and green infrastructure along JE Boone Blvd from Northside Dr to Mayson Turner Rd.
Complete StreetConstruction03
Buckhead Area Smart System
Improved signal operations throughout the Buckhead area using signal upgrades, including radar detection and traffic responsive signal timing.
Traffic SignalsConstruction07, 08
ADA Improvements - FC-8250
Includes ADA improvements at West Paces Ferry, Tye St, North Ave, Sylvan Rd, Sheridan Rd, Moores Mill Rd, Linden Ave, Lindbergh Way, Flat Shoals Rd, North Camp Creek Pkwy, Cheshire Bridge Rd, McLendon Ave, Oakdale Rd, Loridans Dr, Mayson St, Empire Industrial Blvd, College Ave, Fair St, Lawton St, Ruby Harper Blvd, Southside Industrial Ct, Southside Industrial Pkwy, Southside Industrial Way, Wilson Rd, Decatur St, and Guilford Forest Dr.
Sidewalks & MobilityComplete02, 03, 04, 05, 06, 07, 08, 11, 12
Childress Dr Bridge
Includes the replacement of the Childress Dr Bridge over South Utoy Creek between Key Dr and Cascade Rd. The bridge will include two 12-foot lanes and sidewalk on the east side of Childress Dr.
BridgesConstruction11
10th St. Pedestrian Safety
Improves pedestrian and bicycle safety at multiple locations along 10th St. Includes installation of Pedestrian Hybrid Beacon (PHB) at Grady High School, PHB pedestrian and bicycle crossing at Myrtle St, and Rectangular Rapid Flashing Beacon (RRFB) at Argonne Ave. Also includes curb extension bulb-outs at each location to improve sight distance and provide for safer crossing.
Traffic SignalsComplete02, 06
Atlanta Beltline
Includes right-of-way acquisition for Atlanta Beltline expansion.
Multi-use TrailsConstruction01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12
Signal Optimization
Includes installation of and signal technician services for upgraded vehicle and pedestrian detection equipment, smart city technology, and traffic monitoring cameras throughout the City.
Traffic SignalsConstruction01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12
MLK Jr. Dr Complete Street
Includes resurfacing, restriping, bicycle lanes, landscaping, and traffic improvements from Northside Dr to Fulton Industrial Blvd. Work also includes a protected bike and pedestrian facility from Sunset Ave to Northside Dr.
Complete StreetConstruction03, 04, 10
Atlanta Memorial Park
Includes the construction of sidewalks around Atlanta Memorial Park along Wesley Dr and Woodward Way.
Sidewalks & MobilityConstruction08
Smart Cities Traffic Congestion Mitigation Program (GT MOU)
A research project to identify ways to improve transportation infrastructure operating efficiency through integration of existing smart sensor data from the North Ave corridor and the downtown special events area.
Traffic SignalsComplete03
Howell Mill Rd @ Moores Mill Rd Intersection Improvements
Includes improvements to relieve congestion at the Howell Mill/Moores Mill Rd intersection -- addition of turn lanes, a new traffic signal system to replace exiting stop-controlled intersection, and emergency vehicle signal control.
Traffic SignalsDesign08
AIM Fiber Comm Group
Includes installation of fiber between City facilities and procuring the network integration equipment for the City's Fiber network.
Traffic SignalsComplete01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12
Traffic Combo 2 (Design Only)
DESIGN ONLY. For fiber installation, minor signal upgrades, and signal removals on several corridors, including signal cabinet upgrades, vehicle detection, ADA ramps, and pedestrian push-button upgrades. Corridors include R D Abernathy Blvd/Georgia Ave, Atlanta Ave, Hosea Williams Dr, Boulevard, McDaniels St, and Glenwood Ave. Atlanta Ave includes signage to support one-way to two-way conversion.
Traffic SignalsDesign01, 04, 05, 12
Resurfacing - Local Group 1 (FC-9580)
Includes resurfacing on Avondale Ave, Bagwell Dr, Bent Creek Way, Bicknell St, Brookeline St, Browntown Rd, Empire Way, Fairway Cir, Francis Ave, Gayles Ct, Gilbert St, Hansell St, Hemphill School Rd, Hollow Tree Ln, King Smith Rd, Marion Ave, Muse St, Niskey Lake Rd, Pickfair Way, Polar Rock Rd, Rays Ln, Richland Rd, Rosalia St, Sandys Lane, Springdale Pl, Springdale Rd, Waynes Ct, and York Ave.
ResurfacingComplete01, 04, 09, 10, 11, 12
Resurfacing - Local Group 2 (FC-9962)
Includes resurfacing on 18th St, Aurora Ave, Hills Pl, Huber St, McAfee St, Mims St, Montgomery Ferry Dr, Morehouse Dr, North Ivy Rd, North Morningside Dr, Old Chattahoochee Ave, Old Ivy Rd, Pine St, Sunset Ave, Travis St, Verbena St, Westminster Dr, Whitaker Cir, and Whitaker St. The project also includes new striping for bicycle facilities and ADA crossings for Montgomery Ferry Dr, North Morningside Dr, and Old Ivy Rd.
ResurfacingConstruction03, 04, 06, 07, 09
Resurfacing - Citywide (FC-8831)
Includes resurfacing on Barnett St, Beaver Falls Pl, Bethany Forest Dr, College Ave, Decatur St, East Cleveland Ave, Empire Blvd, Fair St/ASM Blvd, Forest Crossing Dr, Forest Overlook Dr, Forest Overlook Tr, Guilford Forest Dr, Guilford Forest Ln, Hamden Forest Tr, Hamden Forest Dr, Hamden Trace, Harbin Rd, Jewel Court, Lakewood Ave, Lakewood Way, Lawton St, Lindbergh Way, Linden Ave, Loridans Dr, Marietta St, Mayson St, New Britain Dr, New Haven Ct, North Angier Ave, North Ave, North Camp Creek Pkwy, Old Chattahoochee Ave, Overlook Court, Polo Dr, R.D. Abernathy Blvd, Ruby Harper Blvd, Southside Industrial Ct, Southside Industrial Pkwy, Southside Industrial Way, Sylvan Rd, Willowood Ln, Wilson Rd, and restriping to accommodate bicycle lanes on 14th St.
ResurfacingComplete01, 02, 03, 04, 05, 06, 07, 09, 11, 12
Centennial Olympic Park Dr (TCC)
Includes signal upgrades, fiber communications, and signal timing optimization from Marietta St to North Ave.
Traffic SignalsComplete02, 03, 04
Resurfacing - GDOT Group A (FC-9403)
Includes the resurfacing of 8th St, Beecher St, Bolton Rd, Campbellton Rd, Collier Dr, Collier Rd, County Line Rd, Defoors Ferry Rd, Ellsworth Industrial Blvd, Fair Dr, Fairburn Rd, Hills Ave, Howell Mill, Huff Rd, Margaret Mitchell Dr, Metropolitan Pkwy, Northside Pkwy, Northwest Dr, Peachtree Battle Ave, Stanton Rd, and Stone Hogan Connector.
ResurfacingConstruction03, 04, 08, 09, 10, 11, 12
Campbellton Rd Signals
Includes the replacement of traffic signal LEDs, cabinets, controller monitors, signal wirings, communications, ADA ramps and timing at multiple intersections between Lee St and Greenbriar Pkwy.
Traffic SignalsConstruction04, 11, 12
Resurfacing - Citywide (FC-6945)
Includes the resurfacing of 10th St, Alvarado Ter, Ardwick Ct, Avon Ave, Berne St, Bohler Rd, Brownlee Pl, Brownlee Rd, Burton Rd, Camrose Way, Cedar Island Dr, Cleveland Ave, Delmar Lane, Derry Ave, Dill Ave, East Andrews Dr, East Court Dr, East Roxboro Rd, Elmtree Dr, Emerald Ct, Federal Ter, Fleetwood Cir, Gault St, Glennhurst Ln, Hapeville Rd, Hazelwood Dr, Hightower Rd, Howell Dr, Howell Ter, Jefferson St Phase 1 and 2, Jewel Dr, La Salle Way, Lake Ave, Landrum Dr, Langston Ave, Larchwood St, Litherland Ct, Little Hampton Ct, Lynhurst Dr, Macon Dr, Mays Crossing, Murphy Ave, Oakshire Way, Old Hapeville Rd, Peachtree Dunwoody Rd, Redbud Ln, Regency Park Dr, Rutgers Dr, South Gordon, Spring Lake Ct, Stokes Ave, Straton Trace, Valleydale Dr, West Paces Ferry (I-75 to City Limits), and Waterford Rd.
ResurfacingComplete01, 02, 03, 04, 06, 07, 08, 09, 10, 11, 12
ADA Improvements - FC-8249
Maintenance and repair of sidewalks, curbs, driveway aprons, and associated infrastructure on Monroe Dr, East Andrews Dr, Harbin Rd, Collier Rd, Barnett St, Hills Ave, 10th St, 14th St, Baker-Highland Conn, and Hightower Rd.
Sidewalks & MobilityComplete02, 03, 05, 06, 07, 08, 09, 11
Powers Ferry Rd Bridge
Bridge replacement over Nancy Creek from Pineland Rd to Hillside Dr. Work includes installation of two 12-foot lanes and a 10-foot-wide, multi-use trail on the east side of Powers Ferry Rd.
BridgesComplete08
Proctor Creek Greenway - Phase 1
Includes two (2) miles of bike and pedestrian trailway from Bankhead MARTA Station to existing West Highlands Trail.
Multi-use TrailsComplete09
Atlanta Memorial Park Pedestrian Access and Safety Improvements
Includes the construction of a new bicycle and pedestrian bridge between Dellwood Dr and Colonial Homes Cir over Peachtree Creek along with 0.91 miles of concrete sidewalk along Woodward Way NW (Bobby Jones).
Sidewalks & MobilityComplete08
North Ave Smart Corridor
PHASE 1 includes procuring and installing Intelligent Transportation System (ITS), connected vehicle technology, and emergency vehicle signal controls. Also includes upgrading pedestrian detection at majority of the signals and the installation of mid-block crossings with Rectangular Rapid Flashing Beacons (RRFB). PHASE 2 includes design of improved signal timing coordination and other signal upgrades.
Traffic SignalsComplete02, 03, 04
More MARTA
This project is in accordance with legislation 17-R-4269, which authorized the City of Atlanta to enter into an Intergovernmental Agreement with MARTA to set forth roles and responsibilities for the planning, design, construction, and operations of the expansion and enhancements of the rapid transit system, and to designate a Program Management Officer (PMO) Liaison as the point of contact. Legislations 18-O-1488 (Year 1) and 19-O-1252 (Year 2) provide for reimbursement to Atlanta Regional Commission for the salary and applicable benefits of the PMO Liaison.
Sidewalks & MobilityConstruction01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12
East Paces Ferry Rd Complete Street
Includes improved signal communications, signal upgrades, bus stop enhancements, streetscapes, and an extended multi-use trail from Lenox Square Mall entrance to Roxboro Rd.
Complete StreetComplete07
Lynhurst Drive Complete Street
Includes resurfacing and restriping, ADA-compliant ramps, sidewalks, and pedestrian lighting along Lynhurst Dr from Cascade Rd to Martin Luther King (MLK) Jr Dr.
Complete StreetComplete10, 11
Citywide Bridge Improvements
Miscellaneous bridge improvements throughout the City of Atlanta.
BridgesComplete01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12
Courtland St Bridge
Includes a monetary contribution to right-of-way acquisition and associated expenses for GDOT's bridge replacement.
BridgesComplete01
John Portman Boulevard (Harris St) Resurfacing
Includes the resurfacing of John Portman Blvd from Centennial Olympic Park Dr to Piedmont Ave.
ResurfacingComplete02, 04, 05
Streetcar Resurfacing (FC-9561)
Includes resurfacing of Andrew Young International Blvd, Auburn Ave, Carnegie Way, Centennial Olympic Park Dr, Edgewood Ave, Ellis St, Fort St, Jackson St, Luckie St, Park Pl, and Peachtree St in partnership with Atlanta Streetcar.
ResurfacingComplete02, 04, 05
Piedmont Park
Includes acquisition of property for Piedmont Park.
Multi-use TrailsComplete06
Atlanta Signal Coordination System and Congestion Management
Includes installation of and signal technician services for upgraded vehicle and pedestrian detection equipment, smart city technology, and traffic monitoring cameras throughout the City.
Traffic SignalsComplete01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12
Midtown CID Improvements
Four (4) intersection improvements on Peachtree St at 14th St, 15th St, Peachtree Cir, and Buford-Spring Connector. Includes new curb, ADA upgrades, sidewalk replacement, crosswalk restriping, vehicle detection at signals, and mast arm traffic signals.
Traffic SignalsComplete02, 03, 06
Mt. Paran Rd @ Randall Mill & Conway Dr Intersection Improvements
Includes signal improvements at intersection of Mt. Paran Rd at Randall Mill Rd and Conway Dr.
Traffic SignalsComplete08
Safety Communications
Includes procuring and installing cameras for the Video Integration Center (VIC).
Traffic SignalsComplete02
School Zone Beacons
Includes the installation of solar-powered school zone beacons throughout the City of Atlanta.
Traffic SignalsComplete01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12
Glenwood and Moreland Intersection
Includes the right-of-way acquisition for the realignment of the Glenwood Ave/Moreland Ave intersection.
Roadway ImprovementsDesign01, 05
Lee Circle Roadway Construction
Includes concept for roadway widening and improvements, installation of curb, gutter, and sidewalk from Roxboro Dr to Towerview Dr.
Roadway ImprovementsComplete07
Lyndale Drive Roadway Construction
Includes concept for roadway widening and improvements, installation of curb, gutter, and sidewalk from Woodland Ave to Moreland Ave.
Roadway ImprovementsComplete01
Citywide Signal System Upgrades & Studies
Includes miscellaneous small signal projects throughout the City of Atlanta.
Traffic SignalsComplete01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12